Roadworks: Low Harker road closure, 5 October – 18 December

The road at Low Harker is closed from 5 October to 18 December while drainage is installed, along with new manholes, kerbing, a new footpath and resurfacing. A diversion is in place for the same period.

  • Location: Low Harker, from the new development to the junction with the A7 (Harker to Rockcliffe road crossing the A74)
  • Dates: 5 October – 18 December
  • Traffic management: Road closure, with diversion in place
  • Expected delays: Delays likely
  • Works: Metcalfe Civil Engineering; responsibility: Cumberland Council
  • Reference: P5007S599

Related works on the A7 near the Low Harker road (a foul water main, kerbing and footpath resurfacing) are running from 5 to 18 October with multi-way traffic signals, and delays are likely there too. Reference: P5011S1031.

Full details and the latest updates, including the diversion route, are on one.network: road closure, diversion and A7 signals.

If you have any concerns about these works, please get in touch.

Response

  1. […] Roadworks: Low Harker road closure, 5 October – 18 December […]

    Like

Leave a Reply